A Large-scale Mechanical Animatronic Installation

Dec. 21, 2023

Customization

Customization cycle: 12-18 months

Customized price: from 3 million USD

Factors influencing the price:

Modeling, structure, parameters, action requirements, process, delivery cycle,

Special decoration, load-bearing, climatic conditions of the operation site, site load-bearing, site slope, special certification, logistics, special after-sales needs, etc.


Transportation-related Matters

1. Transportation  depends on destination

2. Equipment required for transportation - (9.6m high hurdle truck)

3. Personnel required for transportation - (1 person)

4. Time required for installation - (about 6 hours)

5. Installation of equipment required - (crane, forklift)

6. Personnel required for installation - (4 people)

7. Time required for disassembly - (about 8 hours)

8. Dismantling equipment required - (cranes, forklifts)

9. Personnel required for dismantling - (4 people)

10. Approach site requirement - (220v, 5Kw)

11. Transportation traffic control - (need to determine whether the vehicle can enter, etc.)